[DETOUR] between Pförring and Neustadt

During 2022 and until the end of 2023, the Danube Cycle Path must be rerouted between Pförring and Neustadt due to a dike rehabilitation. The Danube cycle path is not passable on the dike between Pförring and Neustadt bridge during this period. The detour is signposted.

Detour (GPX)

Download (164,2 KB)